Final (100%) Front End Documents, Drawings and Technical Specifications and ABET CalculationsDue
- Due Dec 9, 2021 by 7:45am
- Points 460
- Submitting a file upload
- File Types pdf
- Available Sep 6, 2021 at 12am - Dec 16, 2021 at 7:45am
9.1.2021 jck
Please address four technical areas (structural, geotechnical, environmental, construction, hydraulic, transportation, and surveying) in both your drawings and specs.
Upload a copy of your Final Front End Documents, Drawings and Technical Specifications in pdf format. All components must be uploaded in a single pdf file.
This final document is your teams response to the comments made on the 90% Front End and Technical Specifications Submittal, and, the 75% Drawings Submittal, with final ABET Calculations. You may simply resubmit the 75% documents If your team is satisfied with the the condition (and the associated score) of those documents.
Rubric
Please include a title
Keep in mind that 45 students have already been assessed using this rubric. Changing it will affect their evaluations.
Criteria | Ratings | Pts |
---|---|---|
1. Utilized appropriate base documents as directed.
threshold:
pts
|
pts
--
|
|
2. Included all required front end sections revised to meet specific project requirements.
threshold:
pts
|
pts
--
|
|
3. Included technical sections revised to meet specific project requirement to describe parts of 4 civil engineering technical areas.
threshold:
pts
|
pts
--
|
|
4. Created project-specific documents that allow construction of a portion of the recommended solution?
threshold:
pts
|
pts
--
|
|
5. Effectively organized the submittal, with contract documents and drawings in the proper sequence?
threshold:
pts
|
pts
--
|
|
6. Effectively delivered the document and drawings?
threshold:
pts
|
pts
--
|
|
7. Submittal includes signed submittal letter?
threshold:
pts
|
pts
--
|
|
8. Bid documents include table of contents with technical specification divisions appropriate to the project? Although a complete set of specifications is not expected, teams are expected to provide a complete list of the technical specifications that would be needed for the project.
threshold:
pts
|
pts
--
|
|
9. Bid documents include a complete list of drawings needed for the work?
threshold:
pts
|
pts
--
|
|
10. Bid documents include invitation to bid with a description of the work?
threshold:
pts
|
pts
--
|
|
11. Bid documents include instructions to bidders, including project milestone schedule consistent with the separately submitted Gantt chart?
threshold:
pts
|
pts
--
|
|
12. Bid documents include bid form for general prime contractor (GPC)?
threshold:
pts
|
pts
--
|
|
13. Bid documents include sealed bid envelope label?
threshold:
pts
|
pts
--
|
|
14. Bid documents include GPC bid bond?
threshold:
pts
|
pts
--
|
|
15. Bid documents include designation of confidential/proprietary information?
threshold:
pts
|
pts
--
|
|
16. Bid documents include affidavit of compliance with minority business enterprise and disabled veteran-owned business requirements?
threshold:
pts
|
pts
--
|
|
17. Bid documents include request for submittal approval?
threshold:
pts
|
pts
--
|
|
18. Bid documents include request for subcontractor approval?
threshold:
pts
|
pts
--
|
|
19. Contract form includes performance bond?
threshold:
pts
|
pts
--
|
|
20. Contract form includes payment bond?
threshold:
pts
|
pts
--
|
|
21. Contract form includes construction contract?
threshold:
pts
|
pts
--
|
|
22. Contract conditions include general conditions of the GPC contract?
threshold:
pts
|
pts
--
|
|
23. Contract conditions include supplementary general conditions, using appropriate state or federal form?
threshold:
pts
|
pts
--
|
|
24. Specification follows Division 01 - General Requirements that reflect action conditions and requirements of the project?
threshold:
pts
|
pts
--
|
|
25. At least four of the following:
Related to construction engineering?
Related to environmental engineering? Related to geological engineering? Related to geospatial or surveying work? Related to hydraulic design? Related to hydrology/storm water design? Related to structural engineering? Related to transportation engineering?
threshold:
pts
|
pts
--
|
|
26. Contract addenda - blank form
threshold:
pts
|
pts
--
|
|
27. Cover sheet with project location and contents expected in a complete drawing set?
threshold:
pts
|
pts
--
|
|
28. General sheets with legends, as needed?
threshold:
pts
|
pts
--
|
|
29. North arrows on all plan images?
threshold:
pts
|
pts
--
|
|
30. Scale bar and/or dimensions for all images?
threshold:
pts
|
pts
--
|
|
31. Student work disclaimer on every sheet?
threshold:
pts
|
pts
--
|
|
32. Was all text readable and spelled correctly?
threshold:
pts
|
pts
--
|
|
33. Were all lines readily visible?
threshold:
pts
|
pts
--
|
|
34. A sufficient number of drawings to show the team understood project constructability? A complete drawing set is not expected (although the cover sheet should list what is expected in a complete set - see above).
threshold:
pts
|
pts
--
|
|
35. ABET Requirement: Documented the solution of a differential equation and documented the application of the differential equation to the solution of an engineering problem for this project?
threshold:
pts
|
pts
--
|
|
36. ABET Requirement: Documented the solution of a calculus-based physics problem and documented the application of the physics problem to the solution of an engineering problem for this project?
threshold:
pts
|
pts
--
|
|
37. ABET Requirement: Documented the solution of a chemistry problem and documented the application of the chemistry problem to the solution of an engineering problem for this project?
threshold:
pts
|
pts
--
|
|
38. ABET Requirement: Documented the solution of a biology or geology problem and documented the application of the biology or geology problem to the solution of an engineering problem for this project?
threshold:
pts
|
pts
--
|
|
39. Included Opinion of Probable Cost?
threshold:
pts
|
pts
--
|
|
40. Included a Project Schedule?
threshold:
pts
|
pts
--
|