75% Geotechnical Report Due
- Due Oct 21, 2021 by 7:45am
- Points 140
- Submitting a file upload
- File Types pdf
- Available Sep 6, 2021 at 12am - Oct 28, 2021 at 7:45am
09.17.2021
General guidance and requirements for the 75% Geotechnical Report is provided here. Links to an external site.
Upload a pdf of your 75% report to Canvas and submit two (2) printed and bound copies of the geotechnical report at the beginning of class.
Examples of student geotechnical reports can be seen here Links to an external site. with the scored rubric shown here Links to an external site.. A second student geotechnical report can be found here Links to an external site. with the graded rubric shown here Links to an external site..
An additional example is provided here. Links to an external site.
A professional geotechnical report is shown here Links to an external site..
Reports, specifications, drawings typically go through a number of internal and external reviews before they are complete. Formal review at 30%, 60%, and 90% is common. Your team should conduct its own internal reviews before submitting this 75% review document.
The project may be modified during design, requiring revisions to this 75% Geotechnical report. Expect some modifications as a result.
In addition, comments and markups by the final review team (in this case your instructors) are likely and should be addressed by your team for the final submittal.
Rubric
Criteria | Ratings | Pts |
---|---|---|
1. Project description relative to geotech issues
threshold:
pts
|
pts
--
|
|
2. Local geology (soil, glacial status and bedrock depth)
threshold:
pts
|
pts
--
|
|
3. Description of investigation program
threshold:
pts
|
pts
--
|
|
4. Boring logs and boring location plan
threshold:
pts
|
pts
--
|
|
5. Surface characteristics of site (topography, history, nearby features / structures, evidence of contamination)
threshold:
pts
|
pts
--
|
|
6. Subsurface profile from exporation program (soil / rock, layers, lab test data, evidence of possible contamination)
threshold:
pts
|
pts
--
|
|
7. Groundwater conditions (depth, flow direction, and influencing factors)
threshold:
pts
|
pts
--
|
|
8. Recommended foundation and floor slab support, including alternatives considered
threshold:
pts
|
pts
--
|
|
9. Foundation detail drawing
threshold:
pts
|
pts
--
|
|
10. If shallow foundations: allowable bearing pressure, bearing capacity, settlement (all with calculations) or, If deep foundations: pile alternatives, typical design capacity, estimated lengths (all with calculations)
threshold:
pts
|
pts
--
|
|
11. Site preparation recommendations: clearing, stripping, proof-rolling, removal of unsuitable material)
threshold:
pts
|
pts
--
|
|
12. Potential construction issues (e.g. on-site fill sources, removal of poor soils, potential impacts of weather, dewatering recommendations)
threshold:
pts
|
pts
--
|
|
13. Earth pressure coefficients for design of below grade structures (such as basements and retaining walls)
threshold:
pts
|
pts
--
|
|
14. Effectively delivered a written document? In assessing performance please consider whether the document: Identified and created suitable graphics and equations and integrated them usefully to clarify technical concepts. Employed clear, concise, unambiguous, and cohesive writing (with emphasis on correct mechanics and fluid style). Was free of spelling errors.
threshold:
pts
|
pts
--
|