Rubric

Keep in mind that 45 students have already been assessed using this rubric. Changing it will affect their evaluations.
A10 - 75% Drawings Submittal Rubric
A10 - 75% Drawings Submittal Rubric
Criteria Ratings Pts
1. Created project-specific plans that allow construction of a portion of the recommended solution?
threshold: pts
40 pts Exceeded Expectations
36 pts Met Expectation
32 pts Met Expectation
28 pts Met Expectation
24 pts Did not meet expectations
16 pts No evidence of work
pts
40 pts
--
2. Utilized appropriate base documents as directed.
threshold: pts
10 pts Exceeded Expectations
9 pts Met Expectation
8 pts Met Expectation
7 pts Met Expectation
6 pts Did not meet expectations
4 pts No evidence of work
pts
10 pts
--
3. Effectively organized the submittal, with drawings in the proper sequence?
threshold: pts
30 pts Exceeded Expectations
27 pts Met Expectation
24 pts Met Expectation
21 pts Met Expectation
18 pts Did not meet expectations
12 pts No evidence of work
pts
30 pts
--
4. Effectively delivered the drawings?
threshold: pts
30 pts Exceeded Expectations
27 pts Met Expectation
24 pts Met Expectation
21 pts Met Expectation
18 pts Did not meet expectations
12 pts No evidence of work
pts
30 pts
--
5. Cover sheet with project location and contents expected in a complete drawing set?
threshold: pts
10 pts Met Expectations
0 pts No evidence of work
pts
10 pts
--
6. General sheets with legends, as needed?
threshold: pts
10 pts Met Expectations
0 pts No evidence of work
pts
10 pts
--
7. North arrows on all plan images?
threshold: pts
10 pts Met Expectation
0 pts No evidence of work
pts
10 pts
--
8. Scale bar and/or dimensions for all images?
threshold: pts
10 pts Met Expectation
0 pts No evidence of work
pts
10 pts
--
9. Student work disclaimer on every sheet?
threshold: pts
10 pts Met Expectation
0 pts No evidence of work
pts
10 pts
--
10. Was all text readable and spelled correctly?
threshold: pts
10 pts Met Expectation
0 pts No evidence of work
pts
10 pts
--
11. Were all lines readily visible?
threshold: pts
10 pts Met Expectation
0 pts No evidence of work
pts
10 pts
--
12. A sufficient number of drawings to show the team understood project constructability? A complete drawing set is not expected (although the cover sheet should list what is expected in a complete set – see above)
threshold: pts
10 pts Met Expectation
0 pts No evidence of work
pts
10 pts
--
13. Drawings Representing at least four of the following : Construction engineering? Environmental engineering? Geological engineering? Geospatial or surveying work? Hydraulic engineering/ Hydrologic/storm water design? Structural engineering? Transportation engineering?
threshold: pts
10 pts All Four Included
7.5 pts Three Included
5 pts Two Included
2.5 pts One Included
0 pts No Drawings Included
pts
10 pts
--