75% Drawings Due
- Due Nov 23, 2021 by 7:45am
- Points 200
- Submitting a file upload
- File Types pdf
- Available Sep 6, 2021 at 12am - Nov 30, 2021 at 7:45am
01.05.2021
Please address four disciplines in your drawings (structural, geotechnical, environmental, construction, hydraulic, transportation, and surveying).
Submit a pdf of your drawings online and one hard copy printed on one-sided, 11x17, 20 lb paper, in class.
Reports, specifications, drawings typically go through a number of internal and external reviews before they are complete. Formal review at 30%, 60%, and 90% is common. Your team should conduct its own internal reviews before submitting this 75% review document. Your team should prepare this document as "100%" complete, with no additional work required on your part. However, comments and markups by the final review team (in this case your instructors) are likely and should be addressed by your team for the final submittal.
A general discussion and instructions for preparation of project drawings can be found here Preparing_Plans.pdf Links to an external site.. and here Construction_Drawing_Types.pdf Links to an external site..
Specific guidance on preparing contract documents using particular document sets can be found at the following links.
Default - Wisconsin Department of Administration Documents shall be used to complete all projects.
:https://doa.wi.gov/Pages/DoingBusiness/MasterSpecsDesignGuide.aspx Links to an external site..
Drafting and CADD standards and templates can be found at: https://doa.wi.gov/Pages/DoingBusiness/CAD.aspx Links to an external site..
Past student submittals and grading sheets can be reviewed at the instructors office. Electronic versions of student final documents (which include the Drawings) are available here, Links to an external site. here Links to an external site., and here Links to an external site.
Construction documents prepared by professionals are available at Professional Construction Documents Links to an external site..
The structure of the assignment has changed for this semester, so be careful when applying these examples to this semesters requirements.
The rubric shown below is identical to the Drawings portion of the 100% Project Manual submittal. Use it as guidance for preparation of your drawings.
Rubric
Criteria | Ratings | Pts |
---|---|---|
1. Created project-specific plans that allow construction of a portion of the recommended solution?
threshold:
pts
|
pts
--
|
|
2. Utilized appropriate base documents as directed.
threshold:
pts
|
pts
--
|
|
3. Effectively organized the submittal, with drawings in the proper sequence?
threshold:
pts
|
pts
--
|
|
4. Effectively delivered the drawings?
threshold:
pts
|
pts
--
|
|
5. Cover sheet with project location and contents expected in a complete drawing set?
threshold:
pts
|
pts
--
|
|
6. General sheets with legends, as needed?
threshold:
pts
|
pts
--
|
|
7. North arrows on all plan images?
threshold:
pts
|
pts
--
|
|
8. Scale bar and/or dimensions for all images?
threshold:
pts
|
pts
--
|
|
9. Student work disclaimer on every sheet?
threshold:
pts
|
pts
--
|
|
10. Was all text readable and spelled correctly?
threshold:
pts
|
pts
--
|
|
11. Were all lines readily visible?
threshold:
pts
|
pts
--
|
|
12. A sufficient number of drawings to show the team understood project constructability? A complete drawing set is not expected (although the cover sheet should list what is expected in a complete set – see above)
threshold:
pts
|
pts
--
|
|
13. Drawings Representing at least four of the following :
Construction engineering?
Environmental engineering?
Geological engineering?
Geospatial or surveying work?
Hydraulic engineering/
Hydrologic/storm water design?
Structural engineering?
Transportation engineering?
threshold:
pts
|
pts
--
|